Every job below is one we do ourselves across Moreno Valley.
We build decks from the footings up, sized and framed to carry the load you'll actually put on them, furniture, a grill, a hot tub if that's the plan. Footings go below grade and get set in concrete, not just set on a paver, and joist spacing is set to the span tables for your decking material, not the minimum the inspector will allow.
Soft spots, bouncy boards and loose railings usually mean something underneath has failed, not just the board you're standing on. We pull the decking back far enough to find the actual problem, whether that's a cracked joist, a rusted hanger or a ledger bolt that's worked loose, and fix that before anything new goes down.
Sun bleaches and dries out deck boards faster here than most places, and an unsealed deck can start checking and splintering within a couple of summers. We pressure wash first, let the wood dry fully, then stain with a product rated for UV, not just a clear coat that'll peel in a year.
Multi-level decks, built-in benches, a layout that works around an existing tree or slope, we draw it out before we cut anything. You see the footprint and railing style on paper first, so there's no surprise once the lumber shows up.
Composite boards don't require yearly staining and hold up better against the sun than untreated wood, which matters a lot out here. It costs more per board than pressure-treated lumber, so we'll walk you through the real payback instead of just upselling it.
A railing that wobbles when someone leans on it is usually a post that's not through-bolted to the frame, not a railing problem at all. We rebuild the post connection to the joists first, then set baluster spacing to the 4-inch code gap before the rail caps go on.
If the frame underneath is still solid but the boards are cupped, splintered or just outdated, we can pull the decking and replace it without touching the structure. This is usually faster and cheaper than a full rebuild, as long as the joists pass inspection.
Split joists, rotted rim boards, a ledger that's pulling away from the house, this is the work most people never see and the reason a deck fails before it should. We replace hardware with corrosion-resistant fasteners, since standard screws rust out faster in lumber treated with modern preservatives.
Old deck coming down before the new one goes up, or just coming down. We pull the fasteners out of the ledger carefully so we don't tear the siding or flashing behind it, and haul off every board.
A deck that gets full sun from noon on doesn't get used much in July. A pergola or a shade cover over part of the deck buys you usable hours in the afternoon without screening in the whole thing.
Four steps, and no surprises in any of them.
You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.
In writing, itemised, free. If something might add cost later we flag it now rather than at the end.
Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.
You point out anything you are not happy with and we fix it before the invoice, not after.
Deck crews available across these Inland Empire cities.
What to expect once a deck project gets underway.
Describe the problem and we will tell you what it probably is. No obligation.